Check the peak.
Then check the duration.
Explore whether a battery could cover an illustrative active-power shortfall. This tool cannot establish available network capacity or connection approval.
One event, clearly defined.
ILLUSTRATIVE STARTING VALUESThe network still
needs its own assessment.
This kW calculation does not assess power factor, phase balance, fault level, voltage or protection. Discuss the complete arrangement and a suitable control strategy with a competent installer and your DNO.
Prepare for your DNO conversation